PRIMARY BATH REMODEL

This primary bathroom remodel was an absolute dream job and dream client! My dream client wanted to modernize her bathroom by:

– Updating the shower
– Remove old toilet and install an ADA toilet
– Remove the dated wallpaper and warm up the paint
– Update the lighting and install dimmers
– Remove the carpet because who installs carpet in a bathroom?!?!

We also removed the huge and outdated jacuzzi bathtub and added extra cabinets and storage to house her amazing collection of skin care products. See below the transformation!

*Disclaimer: the final cabinet design was not mine, the client used a local cabinet maker. Once the clients vision had been sketched out, we provided these to the cabinet maker and he built what the client envisioned.

My role was to assist with concept design then I met with the client on all Furniture, Fixture and Equipment options, paint colors, hardware, overall esthetics and budget management.

Project FFE:

Paint: Sherwin Williams SW2820 Downing Earth/ 2822 Downing Sand/ 7006 White

Shower Tile: MARBLE ATTACHE LAVISH – Golden Reverie MA71 (PL) 12 x 24

Floor Tile: ADVENTURO™ RIGID CLICK – 4.5 mm | 12 Mil – AD36 Explorer – 6″ x 48″

Countertops: Marble Center Granite Slab (Ruminate) – Supreme White

Hardware:
Cabinet Drawer Pulls – Polished Chrome
Sink Faucet – Chrome
Shower System – Polished Chrome

Sinks: Oval Sink

Grab Bars: Great Grabz